Route survey, preparation of conceptual and detailed designs, engineering/shop drawings for construction, technical assistance in sourcing and procurement, supply of materials, performance onsite installation, pre commissioning tests, High Voltage Resonance Frequency Test, Partial Discharges test, location and repairing of faults on cable & sheath including identifying the causes and all civil reinstatement works for the entire of range of high voltage cables from 11kV to 400kV Level

SAUDI ARABIA PROJECTS

Sl.No Description  Contractor/Consultant/ Customer  Project Reference Status
         
1 Installation of power cable Link box -64 Nos, Splicing-168 nos & Termination 24 Nos and Sheath test , Sheath fault location  for 115kV, 1Cx1200 Sq.mm, Cu, XLPE cable  National Contrcating  Co Ltd, Saudi  SEC-EOA Contrcat no: 30831211/00  On going 
2 Installation of power cable Link box -41 Nos, Splicing-80 nos & Termination 36 Nos and Sheath test , Sheath fault location  for 115kV, 1Cx1600 Sq.mm, Cu, XLPE cable  National Contrcating  Co Ltd, Saudi  SEC-EOA Contrcat no: 31033077/00  On going 
3 Construction of new Qaisumah 380/115/13.8kV BSP- Installation of 115kV,2000sqmm  Pfisterer Joint/Termination kits - 87nos National Contrcating  Co Ltd, Saudi  SED-EOA- 31031143/00 On going 
  TESTING      
1 HVAC test, Electrical LV test and Cross bonding verification for 115kV Power cable- 4 Ckts National Contrcating  Co Ltd, Saudi  SEC-EOA Contrcat no: 30831211/00  On going 
2 HVAC test, Electrical LV test and Cross bonding verification for 115kV Power cable for 5 Ckts National Contrcating  Co Ltd, Saudi  SEC-EOA Contrcat no: 31033077/00  On going 
3 Construction of new Qaisumah 380/115/13.8kV BSP- LV & HVAC test for of 115kV,2000sqmm cable testing - 7ckt , MV cable Testing - 4circuit, 115kV GIS Testing - 1no National Contrcating  Co Ltd, Saudi  SED-EOA-Contract no: 31031143/00 On going